EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BuckRV-8
- Entry
Date:
Feb 17, 2024
Hours:
0.8
R flap fairing prep
Category: Fuselage
Description:
1. Carefully sanded both sides of the R flap fairing and primed it.
2. Clecoed and test-fit the fairing, and decided to sand the back side a bit more.
3, Removed the fairing, sanded the back side mostly flat, then re-primed it.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.